The installation of a water treatment plant at Green Hills factory in Benin involves a series of carefully coordinated steps to ensure clean and safe water supply for industrial operations. The process starts with a thorough site assessment to confirm proper location, foundation suitability, and utility connections.
After site preparation, the foundation is constructed using reinforced concrete to provide a stable base for heavy equipment. Structural supports and tanks, including media tanks and chemical dosing units, are then delivered and securely installed according to design specifications.
The piping network is laid out next, connecting intake points to processing equipment and treated water outlets. Pipes are carefully aligned, fitted, and welded with corrosion-resistant materials to maintain water purity and system durability.
Key components such as filtration media, dosing pumps, valves, and control panels are installed and integrated into the system. Alignment and calibration of these units are conducted to ensure efficient operation and compliance with water quality standards.
Finally, the entire system undergoes rigorous testing and commissioning. This includes hydraulic pressure tests, chemical dosage accuracy, flow rate verification, and microbial analysis of treated water. Operator training is also carried out to ensure effective plant management and maintenance.
This methodical approach guarantees a fully functional water treatment plant, providing Green Hills factory with reliable access to clean water essential for its production processes.