At Geemeg Engineering, the installation of a cooling tower is a carefully orchestrated process designed to ensure optimal performance and longevity. The journey begins with selecting the ideal site—one that offers a level, stable foundation and ample ventilation, critical for efficient heat dissipation.
Once the foundation is prepared and reinforced according to design specifications, our team begins assembling the cooling tower components. Precision is paramount as structural elements such as the tower shell, chassis, and fill media are carefully installed and aligned. Special attention is given to installing the water distribution system, ensuring even spreading of water across the fill for maximum cooling efficiency.
Ventilation equipment, including fans and draft systems, is mounted with exact positioning to optimize airflow. Drift eliminators are installed to prevent water loss and protect internal components. Every bolt tightened and component placed reflects our commitment to quality and safety.
Finally, the system undergoes thorough testing and commissioning. Water circulation, fan operation, and overall system efficiency are verified and fine-tuned to meet performance standards. This comprehensive installation ensures the cooling tower operates reliably, delivering efficient cooling tailored to the client’s needs.









