Installation of Cooling Tower Basin, Piping and Pumps

Installation of Cooling Tower Basin, Piping and Pumps At Geemeg Engineering, the installation of the cooling tower basin, piping, and pumps at Greenhills Benin was a project marked by precision, teamwork, and adherence to engineering best practices. The process began with site preparation, where our civil team ensured the ground

Read More

Cooling Tower

Cooling Tower At Geemeg Engineering, the installation of a cooling tower is a carefully orchestrated process designed to ensure optimal performance and longevity. The journey begins with selecting the ideal site—one that offers a level, stable foundation and ample ventilation, critical for efficient heat dissipation. Once the foundation is prepared

Read More

Fabrication of Acid Pipeline

Fabrication of Acid Pipeline At Geemeg Engineering, the fabrication of an acid pipeline begins with rigorous planning and material selection. Given the highly corrosive nature of acids, special materials such as alloy steels, ductile iron, or corrosion-resistant alloys are chosen to ensure durability and safety. Our engineers start by reviewing

Read More

Construction of 300,000L of Molasses Tank with Plinth Base

Construction of 300,000L of Molasses Tank with Plinth Base At Geemeg Engineering, every project begins with a clear vision and meticulous planning. When tasked with constructing a 300,000-liter molasses tank, we start by understanding the unique challenges posed by storing such a dense and viscous liquid. Recognizing molasses’ weight and

Read More
  • 1
  • 2